Show simple item record

dc.rights.licenseIn Copyrighten_US
dc.creatorDozier, John Marshall
dc.creatorJackson, Eugene K.
dc.date.accessioned2023-10-20T17:40:15Z
dc.date.available2023-10-20T17:40:15Z
dc.date.created1926
dc.identifierWLURG038_Dozier_Jackson_thesis_1926
dc.identifier.urihttps://dspace.wlu.edu/handle/11021/36349
dc.description.abstractThe problem in this thesis is to provide some kind of suitable approach to the stadium on Wilson Athletic Field from the front of Doremus Memorial Gymnasium, for pedestrians. . . . The solution of this problem, as presented in this thesis, is to construct a steel viaduct with a 10 ft. plank walkway between the above mentioned points, details and design of which are given in the accompanying thesis. [From introductory section]en_US
dc.format.extent72 pagesen_US
dc.language.isoen_USen_US
dc.rightsThis material is made available for use in research, teaching, and private study, pursuant to U.S. Copyright law. The user assumes full responsibility for any use of the materials, including but not limited to, infringement of copyright and publication rights of reproduced materials. Any materials used should be fully credited with the source.en_US
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en_US
dc.titleDesign of a Viaduct from Doremus Memorial Gymnasium to Wilson Athletic Fielden_US
dc.typeTexten_US
dcterms.isPartOfWLURG038 - Student Papersen_US
dc.rights.holderDozier, John Marshallen_US
dc.rights.holderJackson, Eugene K.en_US
dc.subject.fastBridges -- Design and constructionen_US
dc.subject.fastViaducts -- Design and constructionen_US
local.departmentCivil Engineeringen_US
local.scholarshiptypeBachelor of Scienceen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record